Road drainage trench earthwork and waterproof culverts

Road drainage trench earthwork and waterproof culverts

[Public works]

A150 motorway - Rouen (76)
18 000 ml
As part of the A150 project in Rouen, the DRAINCOTEX® solution was used for road drainage trench earthwork, combined with STABILINER® ALVEO to create a water barrier, retain earth and revegetate culverts.

Earth retention on landfill capping

Earth retention on landfill capping

[Environment]

Landfill - Salazie (Reunion Island)
30 000 m2
To enable earth retention to a depth of 30 cm, the AFITER® 3D solution was implemented on the slopes of the landfill’s capping dome.

Drainage under waterproofing layer and esplanade concrete slab

Drainage under waterproofing layer and esplanade concrete slab

[Building]

Philharmonie de Paris (75)
22 000 m2
Philharmonie de Paris involves many outdoor circulation areas. SOMTUBE® FTF was installed in these areas to drain stormwater run-off with a view to limiting contact with the slab waterproofing layer and preventing any risk of ground cracking.

Rinsing of sediments

Rinsing of sediments

[Public works]

Condé-Pommeroeul canal
Vieux-Condé (59) - 55 000 m2
A sediment dredging operation was required as the Condé-Pommeroeul canal was completely silted. A geomembrane was installed, along with DRAINTUBE® FT to protect it and drain the water generated by the rinsing of dredged sediments.

Earth retention and revegetation of slopes

Earth retention and revegetation of slopes

[Hydraulic structure]

Watertight pond - Les Bordes golf course (41)
60 000 m2
To revegetate watertight ponds, the stability of the topsoil layer must be guaranteed. The AFITER® 2D solution was implemented on the slopes of ponds to enable earth retention and therefore revegetation.

Replacement of a granular drainage base

Replacement of a granular drainage base

[Public works]

Valenciennes bypass (59)
15 000 m2
The layout of the new ring road revealed a wetland area under heavy stress due to rising groundwater. The solution implemented was SOMTUBE® FTF to ensure drainage while saving installation time and granular material.

Earth retention in infiltration ponds

Earth retention in infiltration ponds

[Hydraulic structure]

Richwiller (68)
600 to 800 m2
To enable load bearing and earth retention to a depth of 15 cm for long-term revegetation, the ALVEOTER® solution was implemented on the slopes of an infiltration pond, with 45° gradients.

Stabilisation and drainage of eroded slopes

Stabilisation and drainage of eroded slopes

[Public works]

Mombasa airport - Kenya
1000 m2
To stabilise slopes and drain water in a context of torrential rain, the solution implemented was a combination of the SOMTUBE® FTF geocomposite with an earth retention system, ALVEOTER®.

Comforting high-risk embankments

Comforting high-risk embankments

Doum & Maadid neighbourhoods - Rabat (Morocco) - 1 000 m2

In order to secure these slopes, AFITEXINOV intervened to propose its Block® AFIWALL solution.